integration-migrationlisted
Install: claude install-skill Amey-Thakur/AI-SKILLS
# Integration migration
Provider deprecations arrive on their schedule regardless of your
roadmap. Migration is manageable when the integration was abstracted and
painful when their model leaked through your codebase.
## Method
1. **Start from the abstraction boundary.** A well-wrapped integration
confines the change; a leaked one means touching everything (see
third-party-integration).
2. **Compare behaviour, not just documentation.** Run both versions
against the same inputs and diff the results, since undocumented
behaviour differences are where migrations break.
3. **Run in parallel before cutting over.** Shadow the new integration
without acting on its results to build confidence with real traffic
(see canary-analysis).
4. **Migrate behind a flag with a rollback.** Percentage cutover with an
immediate revert path, because the problems appear at volume (see
feature-flags-hygiene).
5. **Plan data migration separately.** Identifiers, historical records,
and stored references need their own migration and often outlive the
API cutover (see data-mapping).
6. **Keep the old path until the new one is proven.** Deleting the
fallback on cutover day removes the option you most need.
7. **Start early relative to the deadline.** Deprecation dates are firm
and discovering a blocking incompatibility late leaves no options.
## Boundaries
Migration effort scales with how deeply the provider's model penetrated
your system. Some changes have no equi