## 1. MRP (Material Requirements Planning)
### Planning Run
- **MD01** (ECC / S/4HANA): classic total planning run for the configured planning scope
- **MD01N** (S/4HANA): MRP Live → HANA-optimized, faster, recommended
- **MD02**: single-item, multi-level MRP (for testing / selective re-planning)
- **MD03**: single-item, single-level
### MRP Types (Material Master MRP 1 view)
| Type | Description |
|------|-------------|
| PD | MRP — demand-driven (standard) |
| VB | Manual reorder point |
| VM | Automatic reorder point |
| ND | No MRP |
### Lot Sizing Procedures
| Key | Description |
|-----|-------------|
| EX | Lot-for-lot (exact demand quantity) |
| FX | Fixed lot size |
| WB | Weekly lot size |
| MB | Monthly lot size |
| HB | Replenishment up to maximum stock level |
### Exception Messages (MD04)
Do not memorize a universal numeric lookup table. Interpret the exception text,
exception group, element type, requirement/receipt dates, firming state, and the
plant's rescheduling horizon/tolerance settings shown in the actual system.
An exception is a planning signal, not authorization to move or delete supply.
---
## 2. Production Order
### Lifecycle
```
CO01 (Create) → governed Release → Goods Issue (MIGO 261)
→ Confirmation (CO11N) → Final Confirmation → TECO (technically complete)
→ Settlement (KO88) → CLSD (closed)
```
### Key T-codes
| T-code | Description |
|--------|-------------|
| CO01 | Create production order |
| CO02 | Change production order |
| CO