sap-wmlisted
Install: claude install-skill BoxLogoDev/sapstack
## 1. Environment Intake (Critical)
**ECC vs S/4HANA Alert**: WM is **DEPRECATED in S/4HANA (all releases)**.
- **S/4HANA on-premise / RISE**: Use embedded EWM (`sap-ewm` skill) or Stock Room Management
- **ECC 6.0**: WM fully supported through extended maintenance (2025)
- **Dual-run transition**: ECC WM → S/4HANA EWM requires process redesign (not 1:1 mapping)
**Questions to ask user**:
1. ECC 6.0 (which EhP?) or S/4HANA already?
2. Warehouse network: single, multi, or 3PL outsourced?
3. RF terminal / barcode capability active?
4. Current issue: process bottleneck, data accuracy, integration, or migration planning?
---
## 2. Warehouse Structure (LS01N / LS03N / LQUA)
### Hierarchy & Tables
| Level | T-code | Definition | Table |
|-------|--------|------------|-------|
| **Warehouse** | LS01N | Top container, assigned to plants | LAGP |
| **Storage Type** | LS01 | Physical zone (rack, yard, high-bay, flow) | LTYP |
| **Storage Section** | LS03N | Sub-zone (aisle, row) | LEIN |
| **Storage Bin** | LS03N | Individual slot (address: WH-ST-SEC-BIN) | LQUA |
### Warehouse Master (LAGP) Key Fields
- **LGNUM**: Warehouse number (2 chars, e.g., "01")
- **LGSYS**: Flag — `W` (WM system) or `D` (Decentralized)
- **WERKS**: Plant assignment
- **LGPLA** format: 3-digit ST + 3-digit section + 3-digit bin (e.g., "001001001")
### Issue: "Cannot create storage bins"
**Root Cause**: Missing storage section linking
**Check**: SE16N → LEIN (verify section exists); SE16N → LQUA (verif