← ClaudeAtlas

ct-init-projectlisted

Use this skill to run the CT full pipeline from Phase 0 initial setup through macro extraction, conf and toolchain creation, analysis, testing, and observation-record collection, or to perform only the project-preparation stage.
SuresoftTechnologies/dvera-plugin · ★ 0 · AI & Automation · score 72
Install: claude install-skill SuresoftTechnologies/dvera-plugin
# /ct-init-project - Project Preparation **Primary request**: Use this skill to start the whole flow from an end-to-end CT-apply request, or to run only the project-preparation stage. **Role**: - In end-to-end entry mode, start from Phase 0 initial setup, complete project preparation, and then continue to analysis, testing, and the wrap-up task after user confirmation. - In project-preparation-only mode, run `ct-extract-macro` -> `ct-make-conf` -> `ct-setup-project` and stop at `project_created`. **Phase 0 canonical source**: This skill is the canonical source for the Phase 0 initial setup procedure. `ct-orchestrator` reuses the same procedure on resume when bootstrap information is missing or invalid. **User stage labels**: - Project preparation - Analysis - Test **Phase tracking rules**: - In end-to-end entry mode, create a Phase 0-5 checklist before starting and update it as each phase completes. Minimum items are `Phase 0 initial setup`, `Phase 1 macro extraction`, `Phase 2 conf generation`, `Phase 3 project setup`, `Phase 4 analysis`, and `Phase 5 test/wrap-up task`. - In project-preparation-only mode, still use a Phase 0-3 checklist. If the flow stops, the state file and the user-facing report must point to the same phase. **Execution modes**: - **End-to-end entry mode**: enter directly from utterances such as `apply CT`, `start CT setup`, `analyze and test in CT`, or `run CT`. If state already exists, continue from the current stage. If no state exists, start fro