verification-before-completionlisted
Install: claude install-skill aiskillstore/marketplace
# Verification Before Completion
## Overview
Claiming work is complete without verification is dishonesty, not efficiency.
**Core principle:** Evidence before claims, always.
**Violating the letter of this rule is violating the spirit of this rule.**
## The Iron Law
```
NO COMPLETION CLAIMS WITHOUT FRESH VERIFICATION EVIDENCE
```
If you haven't run the verification command in this message, you cannot claim it passes.
## The Gate Function
```
BEFORE claiming any status or expressing satisfaction:
1. IDENTIFY: What command proves this claim?
2. RUN: Execute the FULL command (fresh, complete)
3. READ: Full output, check exit code, count failures
4. VERIFY: Does output confirm the claim?
- If NO: State actual status with evidence
- If YES: State claim WITH evidence
5. ONLY THEN: Make the claim
Skip any step = lying, not verifying
```
## Common Failures
| Claim | Requires | Not Sufficient |
|-------|----------|----------------|
| Tests pass | Test command output: 0 failures | Previous run, "should pass" |
| Linter clean | Linter output: 0 errors | Partial check, extrapolation |
| Build succeeds | Build command: exit 0 | Linter passing, logs look good |
| Bug fixed | Test original symptom: passes | Code changed, assumed fixed |
| Regression test works | Red-green cycle verified | Test passes once |
| Agent completed | VCS diff shows changes | Agent reports "success" |
| Requirements met | Line-by-line checklist | Tests passing |
## Red Flags - STOP
- Using "sho