bridge-forecast-driver-changeslisted
Install: claude install-skill alisonjieli-png/loop-engine
# Bridge forecast driver changes
## When to use
Use this to explain a forecast revision over the same target, horizon, population, and unit. An explanation of a revision is not proof that either forecast will be accurate.
## Inputs
- Baseline and revised forecast identities, values, horizons, units, and populations.
- Driver values and model or calculation versions for both forecasts.
- A supplied attribution method, including its ordering or interaction rule when drivers are not additive.
## Procedure
1. Confirm the two forecasts refer to comparable targets. Report any horizon, population, unit, or definition change separately before calculating a driver bridge.
2. List each driver value before and after, with its source and whether it was observed, estimated, or assumed.
3. Apply the supplied attribution method to calculate each driver's contribution. State the order for sequential replacement or the interaction allocation for a nonlinear model.
4. Reconcile baseline plus attributed changes and any explicit interaction term to the revised value. Keep the remaining residual visible.
5. Check one changed driver with a small worked example and flag an attribution that reverses under a plausible alternative order.
## Completion check
Return the comparable forecast definitions, driver changes, attribution method and order, contributions, interactions, residual, and unresolved assumptions. The bridge must arithmetically reconcile or name the unexplained difference.
## St