keel-review-cyclelisted
Install: claude install-skill berkayturanci/voicebridge
# keel-review-cycle
Use this skill when the user asks to run the keel command `review-cycle` (e.g. `keel review-cycle ...`, `review-cycle <args>`, or `/keel:review-cycle`). It reads every project value from `.keel/project.yaml` via the `keel` CLI.
# /keel:review-cycle
## Live progress — stamp this run (required)
So this run shows live on `keel-visual`'s board, record it with `keel activity` **as you
go**. This command's phases are: `config` → `validate` → `loop` → `reviewers` → `post` → `fixloop` → `report`. Pick one stable `--run-id` for the whole run
(e.g. `review-cycle-<issue-or-pr>`):
- **Right now, before the work below**, stamp the first phase:
`keel activity .keel/project.yaml --root . --write --command review-cycle --run-id "$RUN" --phase config`
- Re-run with the next `--phase` (`validate`, …) **as you advance** through the flow.
- At the end: `keel activity .keel/project.yaml --root . --run-id "$RUN" --done`
Treat this like any other contractual step — do not skip it. The one allowed exception is a
core too old to ship `keel activity` (keel < 1.6.0): then skip it silently and never block
the command.
## Command step evidence
Every numbered step in this command is contractual. Complete the step, record the
evidence it asks for, or explicitly mark it `N/A — <reason>` before moving on. If a step
has an external side effect such as a GitHub comment, issue, review, report, branch, or
PR, the side effect must be posted or written through the selected transport a