kai-sociallisted
Install: claude install-skill cgallic/kai-cmo-harness
# /kai-social — A Week or Month of Posts, Ready to Schedule
> **Kai root note:** `knowledge/`, `harness/`, and `scripts/` paths in this skill live in the Kai install, not the user's project. Resolve them against the first ancestor directory of this SKILL.md that contains a `knowledge/` folder (the Kai plugin root, `~/.claude/kai`, or the kai-cmo-harness repo). `MARKETING.md`, `memory/`, and any output files live in the current project. If a referenced `scripts/` command is not available in this install, say so, skip it, and continue with the file-based guidance — never fabricate its output.
## Objective
A calendar the user approves, then a batch of finished posts against it — each one written natively for its platform, each carrying a hook that survives the first line or first three seconds, and none of which could have been written for any other brand. The batch is scheduleable as-is: copy, hashtags where they apply, visual direction, posting time.
The failure mode this skill exists to prevent is one post reformatted five ways. Platform-native means written for the platform, not resized for it.
## Done when
Work type `social-post` — floor **E5/C2/O3** (`harness/eco-floors.yaml`), read per post.
- **E5** — the provider returns a post id and the public permalink read-back matches the approved text. Drafting reaches E2 (`harness/skill-contracts/social-post.yaml` satisfied); the calendar's approval reaches E3; only publishing carries a post to E5. A batch sitting in `work