ot-change-management-workflowlisted
Install: claude install-skill comradezephyr/ot-ics-agent-skills
## When to Use
- Designing a change management workflow for a new OT network or site.
- Fixing a workflow after an unauthorized change reached production.
- Adding a security review step to an existing engineering change process.
- Aligning the change process with 62443-2-1 requirements.
## Prerequisites
- Asset classes from `ot-backup-and-recovery-design` or the inventory.
- Current change process: what exists, who approves what, where it breaks.
- Zone map from `ot-network-segmentation-design` for class-based routing.
- Backup capability from the recovery design, because rollback depends on it.
- Credentials: none. This skill produces documents.
- Authorization: operations manager owns the approval gates. The design must be accepted by operations, engineering, and security.
- Upstream skills: `ot-backup-and-recovery-design` for the rollback capability.
### Safety
This skill is passive. It produces design documents only.
## Workflow
1. Define change classes. Requirement: approval effort scales with process risk. Anchor: 62443-2-1 4.3.4.3. Decision: classes are controller logic, network and firewall, HMI and historian configuration, OS and platform patching, and safety system. Each class routes to its own gate set. Trade-off accepted: class routing adds classification overhead per request. A single approval path for all changes is either too slow for a firewall rule or too loose for a logic download.
2. Define the request fields. Requirement: the request carries what a