# Extract contract dates
> **PREREQUISITE:** Use the `propper` skill for authentication and tool routing **only**
> when reading documents already stored in Propper. Reading files from disk needs no
> account.
Most missed contract deadlines are not missed because nobody read the contract. They are
missed because the deadline was never written down as a date — it existed only as "sixty
days prior to the end of the then-current term".
The job is to turn durations into dates.
## Steps
### 1. Read the documents
From disk, or from Propper with `locker_list_documents` and `locker_get_document` when
the user's contracts live there. For `ask_doc_question`, supply `agreementId` or the intended
`documentIds` and verify its sources before quoting a deadline; never widen a failed
agreement lookup to the whole library. `locker_extract_risks` and `locker_list_risks` surface what Propper has
already extracted, including renewal and termination terms.
### 2. Find the anchor dates
Every derived deadline hangs off one of these:
- the **effective date** — often not the signature date, and often defined in the preamble
- the **signature dates**, and whether the contract runs from "the date last signed"
- **delivery, acceptance or go-live** dates, where the term starts on an event
If the anchor is blank, unsigned or undetermined, **the whole schedule is undetermined**.
Say that first, list the durations you found, and do not present a computed date built on
a guessed anchor.
### 3. Fin