How long, expressed as a range with the reasons it is that wide. **The drivers
of the range are the deliverable; the number is a summary of them.**
Phases: `REFERENCE → SIZE → AGGREGATE → BUFFER → STRESS`.
## Before starting
- **Require shaped tasks.** A task with no observable done condition cannot be
sized — you would be estimating a description
- **Find comparable actuals first.** An estimate anchored on something that
actually happened beats one anchored on how the work feels; where no
comparable exists, say so and widen the range
- **Establish the real capacity, not the headcount.** State the assumed
productive fraction and what it is based on
<!-- deliver:sizing -->
- **Declare the tier before anything else**, read off the work and stated at the
top of the deliverable. `S` — under a day, reversible: one brief in the
response, **no files, no handoff**. `M` — multi-day, single owner: the brief
and the plan. `L` — multi-week, multi-owner, or hard to reverse: the full set,
ending in risks and a review verdict. **Over-planning an `S` is a failure of
the same weight as under-planning an `L`**
- **The planning gate stops the run at the phase that owns the condition** — the
goal cannot be stated in one sentence without "and", no success criterion is
measurable, a load-bearing assumption is cheap to verify and unverified, or the
person has already decided and is asking for execution; `_planning/SIZING.md`
says whi