planning-replanlisted
Install: claude install-skill simota/planning-skills
<!-- planning:contract -->
## Owns
Post-start divergence, classified and corrected at its owning phase. Pre-start edits return there directly. **Stopping stays on the table
and is priced like any other option.**
Phases: `MEASURE → CLASSIFY → PRICE → CORRECT → RECORD`.
## Before starting
- **Measure before diagnosing**: planned versus actual per task and milestone,
with the numbers stated. **No narrative before the table** — the story you
tell about a slip determines which correction you reach for
- **Name the sunk cost once, to set it aside.** Then decide on remaining cost
and remaining value alone
- **Establish whether the problem changed or only the path.** A changed problem
is a re-framing, not a replan, and treating it as one patches a plan that is
solving the wrong thing
<!-- deliver:sizing -->
- **Declare the tier before anything else**, read off the work and stated at the
top of the deliverable. `S` — under a day, reversible: one brief in the
response, **no files, no handoff**. `M` — multi-day, single owner: the brief
and the plan. `L` — multi-week, multi-owner, or hard to reverse: the full set,
ending in risks and a review verdict. **Over-planning an `S` is a failure of
the same weight as under-planning an `L`**
- **The planning gate stops the run at the phase that owns the condition** — the
goal cannot be stated in one sentence without "and", no success criterion is
measurable, a load-bearing assumption is cheap to verify and unverified,