ppap
SolidProduction Part Approval Process (PPAP) — verify PPAP submission level, audit all 18 elements, check completeness for customer approval, prepare PSW. Use when a supplier needs to submit parts for approval, when reviewing a PPAP package, or when determining which PPAP level is required. Covers AIAG PPAP 4th edition with Ford, BMW, VW, and Stellantis OEM-specific requirements.
Install
Quality Score: 78/100
Skill Content
Details
- Author
- RBraga01
- Repository
- RBraga01/Quality-Engineering-Skills
- Created
- 1 months ago
- Last Updated
- today
- Language
- JavaScript
- License
- MIT
Similar Skills
Semantically similar based on skill content — not just same category
ppap-checker
Interactive PPAP completeness checker — walks through all 18 PPAP elements for a given submission level, identifies missing or incomplete items, and generates a gap report before PSW signature. Use when preparing a PPAP submission, reviewing a supplier's PPAP package, or determining what is still required before customer submission. Covers AIAG PPAP 4th Edition.
apqp
Advanced Product Quality Planning (APQP) — plan and track a new product launch through all 5 phases, identify deliverables per phase, run gate reviews, and ensure quality outputs are complete before Start of Production (SOP). Use when launching a new part, managing an APQP project, or auditing APQP completeness. Covers AIAG APQP 2nd edition and IATF 16949 §8.3.
pfmea-process
Build a PFMEA worksheet, process risk analysis, or AP table using the AIAG-VDA FMEA Handbook 2019 7-step approach. Covers Structure Analysis, Function Analysis, Failure Analysis, Risk Analysis (Action Priority H/M/L), Optimization, and Documentation. Required by IATF 16949 and OEM customer-specific requirements for new processes, process changes, and post-escape PFMEA updates.