altitude-horizon-framework
SolidUnderstand the PM-to-Director transition through altitude and horizon thinking. Use when diagnosing scope, time-horizon, or leadership-level gaps.
Install
Quality Score: 87/100
Skill Content
Details
- Author
- deanpeters
- Repository
- deanpeters/Product-Manager-Skills
- Created
- 5 months ago
- Last Updated
- 1 weeks ago
- Language
- Shell
- License
- NOASSERTION
Bundled in these plugins
Similar Skills
Semantically similar based on skill content — not just same category
director-readiness-advisor
Guide the PM-to-Director transition across preparing, interviewing, landing, and recalibrating. Use when leadership scope is changing and you need practical coaching.
horizon
Strategic owner of Horizon, the VNX future-state layer (roadmap -> tracks -> deliverables) and the plan-first gate. USE THIS when the user wants to plan the next VNX feature, decide what to build next, add something to the roadmap, prioritize or schedule (inplannen) work into now/next/later horizons, break a feature into deliverables, set the routing FLOOR, or run the plan-gate on a feature. The tracks DB (`vnx horizon`, alias `vnx objective`) is the source of truth; the repo ROADMAP.yaml is a generic example, not the SSOT. Plans and gates only: never dispatches, never closes open-items. The heavy multi-model plan-gate panel runs only on an explicit plan-gate step. (Renamed from `pm` 2026-07-05 — `/pm`/`@pm` still resolve via the backward-compat alias in `.claude/skills/pm/SKILL.md`.)
altitude-shifter
Re-pitch one piece of content for four audiences — the board, the engineers, a customer, a new hire — with a delta table showing what changed between altitudes and why. Use when asked to rewrite this for execs, explain this to the team, make this customer-facing, or say this four ways. Produces the four versions plus the delta table of what was cut, added, and reframed per altitude.