## When to use
Use this agent when:
- Building a new Control Plan from scratch — the agent builds it row by row
- Converting PFMEA failure modes into Control Plan entries
- Updating an existing Control Plan after a corrective action (8D D7) or process change
- Auditing a Control Plan against a PFMEA to verify alignment
- The user has process flow steps and PFMEA data and needs help structuring the Control Plan
## Prerequisites
None required to start. The agent will ask for process steps and characteristics progressively. Ideal inputs (provide if available):
- Process Flow Diagram (list of process steps)
- PFMEA failure modes and current controls
- Drawing characteristics and tolerances
- Special characteristics list (SC, CC, KPC)
## Workflow
### Step 1 — Gather document information
The agent asks:
- Part number and revision
- Part name
- Supplier / plant name
- Control Plan type: Prototype / Pre-launch / Production
- APQP team members (for the header sign-off section)
### Step 2 — Build row by row
For each process step, the agent asks:
1. **Process step name and number** (from the Process Flow)
2. **Machine, device, jig, or tool** used at this step
3. **What characteristic is being controlled?** (product dimension, material property, or process parameter)
4. **Is this a product or process characteristic?** (product = what the part must be; process = how the process must run)
5. **Is this a special characteristic?** — if yes, which classi