control-planlisted
Install: claude install-skill RBraga01/Quality-Engineering-Skills
# Control Plan
## When to use
Use this skill when:
- Creating a new Control Plan for prototype, pre-launch, or production
- Reviewing an existing Control Plan for completeness and accuracy
- Updating the CP after a process change, corrective action (D7), or PFMEA update
- Auditing a supplier's Control Plan during qualification or an IATF audit
- Linking PFMEA controls to the Control Plan after FMEA review
## Prerequisites
- Process Flow Diagram (required — CP must mirror the process flow sequence)
- PFMEA (required — CP controls derive from PFMEA recommended actions)
- Drawing with ballooned characteristics and tolerance data
- List of special and significant characteristics (SC, CC, KPC, KCC)
- MSA results for measurement systems referenced in the CP (for production CP)
## Workflow
### Step 1 — Determine the CP type
| Type | When | Purpose |
|------|------|---------|
| **Prototype** | During prototype builds | Describes dimensional, material, and functional tests in prototype phase |
| **Pre-launch** | After prototype, before PPAP | Describes controls in place during pilot/pre-production runs |
| **Production** | After PPAP approval, at SOP | The living document — updated throughout product life |
All three types may coexist during APQP phases. The Production CP is the one submitted as PPAP Element 7.
### Step 2 — Build the Control Plan structure
The CP is a table with one row per characteristic per process step. Each row contains:
**Header section (document-level